Downloads

 

Home
Curriculum Vitae
Research
Downloads
Publications
Contact

 

Number of Lightning-Initiated Simultaneous Outages of Parallel Transmission Lines

M-File Source Codes

Simultaneous Outages

 


The Linear Power Flow

M-File Source Codes

Single-Phase LPF

3-Phase LPF

Note: MATPOWER is needed for the codes to work.


Archive of Power System Transmission and Distribution Test Cases

 

Note: All the m-files are in the format of MATPOWER


Transmission Test Systems

 

WSCC 9-bus

 

IEEE 14-bus

 

IEEE 30-bus

 

New England 39-bus

 

IEEE 57-bus

 

IEEE 118-bus

 

IEEE 300-bus


Distribution Test Systems for Reconfiguration

14-node

33-node

70-node

84-node

119-node

135-node

874-node


Minimum Spanning Tree Formulation of Network Reconfiguration Problem

14-node        Graph

33-node        Graph

 

Home | Curriculum Vitae | Research | Downloads | Publications | Contact

This site was last updated September, 2019