Number of Lightning-Initiated Simultaneous Outages of Parallel Transmission Lines
M-File Source Codes
Simultaneous Outages
The Linear Power Flow
Single-Phase LPF
3-Phase LPF
Note: MATPOWER is needed for the codes to work.
Archive of Power System Transmission and Distribution Test Cases
Note: All the m-files are in the format of MATPOWER
Transmission Test Systems
WSCC 9-bus
IEEE 14-bus
IEEE 30-bus
New England 39-bus
IEEE 57-bus
IEEE 118-bus
IEEE 300-bus
Distribution Test Systems for Reconfiguration
14-node
33-node
70-node
84-node
119-node
135-node
874-node
Minimum Spanning Tree Formulation of Network Reconfiguration Problem
14-node Graph
33-node Graph
Home | Curriculum Vitae | Research | Downloads | Publications | Contact
This site was last updated September, 2019